Certification: | ISO9001:2000 |
Model Number: | NBFP888 |
Minimum Order Quantity: | 10pcs |
---|---|
Packaging Details: | bags in carton |
Delivery Time: | 10days |
Payment Terms: | T/T |
Supply Ability: | 3000pcs per week |
Type: | 1 - 2 Person Tent | Fabric:: | 170T/190T/210T Polyester |
---|---|---|---|
Pole Material: | Fiberglass | Usage: | Leisure, Sports, Camping |
Floor: | PE/Oxford Floor | Size: | 210*210*130cm |
Color: | Customized, To Order | Layers: | Single |
High Light: | pop up camping tent,waterproof camping tents |
2 Persons Double Camouflage Camping Tent With Net Yarn For Outdoor Leisure
Product Name | Camping Tent | ||
Pole | Fiberglass | ||
Fabric | 170Tpolyester / Oxford | ||
Tilt | With tilt | ||
Note | Customized can be accepted | ||
MOQ | 1000 pcs /negociation | ||
Delivery | 20-25 days after your comfirmation | ||
Port | Tianjin | ||
Payment | L/C ; T/T |
FAQ
Q1: How to control the products’ quality?
A:We have always placed great emphasis on quality control to ensure that excellent quality level is maintained. Moreover, the principle we always maintain is "to provide customers with better quality, better price and better service".
Q2: Can you provide OEM service?
A:Yes, we work on OEM orders. Which means size, material, quantity, design, packing solution, etc will depend on your requests; and your logo will be customized on our products.
Q3: What information should I let you know if I want to get a quotation?
A: 1. Size of the products
2. Material and stuff(if have)
3. package
4. Quantities
5. Please send us some pictures and designs for checking if possible so we can do best as your request. Otherwise, we will recommend relevant products with details for your reference.
Q4. Where is Yongkang? Is it possible to visit your factory?
A: Yongkang is located in JinHua city. It is very convenient to visit us, and all clients from all over the world are highly welcome to us.
Q5.Shipping Method and Shipping Time?
A: 1. Express courier like DHL, TNT, Fedex, UPS, EMS etc, shipping time is about 4-7 working days depends on country and area.
2. By air port to port: about 7-12days depends on port.
3. By sea port to port: about 20-35days
Contact Person: Mr.